Galleries

Application Photo Galleries

Take a look at Sky Climber solutions in action!  Click on a link below to view project galleries by application type.  Or, if you are looking for case studies or project news check out the latest posts from our blog.

Recent blog posts:  Case studies and news

We regularly post information about new Sky Climber projects and access solutions from around the world.  Here are some recent posts:

Sloped Skymaster project in San Francisco

Union Square project presents unique challenges The Union Square area of San Francisco is a busy shopping hub, and one building at the corner of Post and Mason streets is getting a facelift with Sky Climber’s Skymaster equipment.   The Medico-Dental building was...

Sky Climber to exhibit at 2020 World of Concrete

The 2020 World of Concrete Convention is just weeks away.  WOC is the industry’s only annual international event dedicated to the commercial concrete and masonry construction industries.  Stop by the Sky Climber booth in the Central Hall at C4365 for the latest in Sky...

Twin BMUs add finishing touch to residential towers remodel in San Francisco

As part of a major renovation project at 888 O’Farrell Street, property owners of a residential complex in San Francisco’s Civic Center neighborhood needed to replace old roof car window washing systems on each of its 2 towers. The towers at 888 O’Farrell...

Wire Rope Terminations – Presentation copies now available

Copies of this presentation are now available.  You may view this presentation with live audio recorded at the Scaffold and Access Industry Association's 2019 Annual Convention in New Orleans or simply download a PDF copy of the slides for viewing or...

Sky Climber Receives second Project of the Year Award

October 4th, 2019.  Delaware, Ohio.   Sky Climber received the Suspended Access Project of the Year award for its contribution to a high-profile electronic sign project in 2018.This award was presented to Ohio-based Sky Climber, LLC and Sky Climber Access...

Custom equipment in Colorado

The Colorado Center Tower III is a 400,000-sq-ft high-rise located near downtown Denver. This 15-story office tower was completed in 2017 but several elements of its window-washing system were incomplete. As part of Sky Climber’s custom socket program, we developed equipment to complete the system.

Lock and Dam application in Kentucky

An ongoing maintenance project in the Kentucky Lock and Dam system required a multi-level suspended access plan and Sky Climber was able to help. Sky Climber provided a work cage, a 2-meter platform, and two separate rigging configurations to allow crews...